FIFA World Cup Qatar 2022
Fan Villages Water Supply System
Project Overview
To support the FIFA World Cup Qatar 2022, LEO Pump delivered 78 sets of BWS Intelligent Pressure Booster Systems to ensure reliable water supply for Fan Villages accommodating over 20,000 visitors per night.
With limited hotel capacity, the construction of large-scale temporary residential facilities required a high-performance and efficient water distribution system capable of handling continuous demand under extreme conditions.
The Challenge
The project required:
- Ensure stable water pressure across large residential fan villages
- Guarantee hygienic and safe freshwater supply for over 20,000 users
- Operate efficiently in a region with scarce natural freshwater resources
- Handle continuous high-demand usage during peak event periods.
The system had to perform reliably throughout the event, with zero tolerance for failure.
The Solution
LEO delivered a fully integrated booster system solution to ensure reliable water supply across the Fan Villages during peak demand.
- Implementation of 78 BWS Intelligent Pressure Booster Systems
- Automatic pressure control based on real-time water consumption
- Energy-efficient operation optimized for large-scale residential use
- Compact and reliable systems for easy installation and maintenance
The solution ensured continuous, efficient, and stable water supply throughout the entire event.
System Configuration
- 78 sets of LEO BWS Intelligent Pressure Booster Systems
- Integrated automatic control system with microprocessor
- Multi-pump configuration for demand-based operation
- Compact skid-mounted design
- Complete system including pumps, controllers, and piping integration
Results
- Reliable water supply for over 20,000 daily users
- Stable pressure across all Fan Village facilities
- Reduced energy consumption through intelligent control
- Fast deployment: delivery completed in approximately 20 days per order
- High operational reliability during peak usage periods
Engineering in Action
LEO leveraged its strong production capacity and engineering expertise to deliver a large-scale solution within tight deadlines.
Through optimized production scheduling and rigorous quality control processes, all systems were delivered efficiently without compromising performance or reliability.
This project highlights LEO’s ability to execute large international projects, providing scalable, energy-efficient water supply solutions for high-demand environments.