Chilled Water Pumping System for Gas Development | Abu Dhabi
Reliable cooling solution for high-demand offshore energy operations
Project Overview
As part of ADNOC’s Dalma Gas Development Project within the Ghasha Concession—one of the world’s largest offshore sour gas developments—LEO delivered a high-performance chilled water pumping system essential for ensuring reliable cooling in critical operations.
Through close coordination between LEO’s Middle East team and headquarters in China, the project was executed with tailored engineering solutions, certified components, and a fully compliant Factory Acceptance Test (FAT) witnessed by ADNOC.
This project reinforces LEO’s capability to deliver high-performance pump solutions for the oil & gas sector, meeting the stringent standards required by global energy leaders.
The Challenge
- Strict ADNOC technical and documentation requirements
- Need for high-spec components exceeding standard configurations
- Complex validation process including FAT supervision
- Coordination across multiple teams and time zones
- Critical requirement for reliability in continuous cooling operations
The Solution
LEO engineered and delivered a fully compliant chilled water pumping system designed to meet the highest industry standards and ensure stable performance in demanding conditions.
- Custom-engineered system tailored to project specifications
- High-performance components ensuring durability and efficiency
- Full compliance with international standards and ADNOC requirements
- Successful FAT execution under client supervision
- Complete documentation and certification delivery
The solution guaranteed reliable and efficient cooling performance for critical offshore operations.
System Configuration
- Pump Type: LEP End Suction Centrifugal Pump
- Model: LEP150-125-400/407
- Flow Rate: 55 L/s
- Head: 54 m
- Power: 55 kW
- Materials: Cast iron body, bronze impeller
- Units Installed: 5
System Features:
- Custom fabricated base frame with integrated drip pan
- HRC coupling with safety guard
- Fully primed and epoxy-coated system
- Designed for continuous-duty industrial cooling applications
Results
The project was successfully delivered in full compliance with ADNOC’s stringent standards, ensuring reliable cooling, operational safety, and long-term performance in a critical oil & gas environment.
Engineering in Action
From design to final validation, LEO coordinated engineering, manufacturing, and testing processes to meet strict project requirements, ensuring precision delivery, successful FAT approval, and seamless integration into a high-demand offshore operation.